Einzelheiten zum Produkt
Herkunftsort: China
Markenname: SCBT
Modellnummer: DAC407236
Zahlungs- und Versandbedingungen
Min Bestellmenge: ≧ 2
Preis: Contact me
Verpackung Informationen: 5*5*5
Lieferzeit: 30
Zahlungsbedingungen: T/T, Western Union
Versorgungsmaterial-Fähigkeit: 10000+20 Tage
Anwendbare Modelle: |
Auto |
Garantie: |
1 Jahr |
Material: |
GCR15 |
Siegeltyp: |
Zz..2rs.abs |
Alt und neu: |
Neu |
Name: |
Radnabe |
Anwendbare Modelle: |
Auto |
Garantie: |
1 Jahr |
Material: |
GCR15 |
Siegeltyp: |
Zz..2rs.abs |
Alt und neu: |
Neu |
Name: |
Radnabe |
DAC407236 43440-54G02 43440-54G01 43420-50851 Front Wheel Hub Bearing Auto Parts for Suzuki With High Quality
43420-50850
43440-54G00
43440-69025
510077
AU0835-4LXL/L588
2002-2007 SUZUKI AERIO
DAC407236 High-Quality Front Wheel Hub Bearing for 2002-2007 SUZUKI AERIO. Need a durable, exact-fit front wheel hub bearing for your 2002-2007 SUZUKI AERIO (sedan/hatchback variant)? Our DAC407236 model (matching 43440-54G02, 43420-50851) replaces OE parts like 43420-50850, 43440-69025, ensuring smooth front-wheel rotation and reliable steering for daily commutes.
Crafted with double-layer zinc plating + electrophoretic coating, it resists corrosion from road salt (winter use) and extends lifespan by 30% vs. generic bearings – cutting long-term replacement costs by 40%. Fully compatible with all 2002-2007 AERIO variants (no need to check engine types: 2.0L I4, 2.3L I4). Backed by a 3-year warranty: free replacement for fitment or performance issues. Great for DIY SUZUKI AERIO owners and repair shops specializing in classic Suzuki compact cars.
The Shipping Way We Use
We use the main delivery companies are as below
We normally will dispatch your order within 2-7 working days depends on stock level, as soon as the order is shipped, we will list the tracking number on your order detail page, if there is any problem regarding to the shipping, please feel free to contact us.
Below shows the estimate delivery time for different courier:
- DHL: 10-14 working days
- FedEx: 7 to 10 working days
- UPS: 7 to 10 working days
- EMS: 10-14 working days